|
Building Inspections Division
|
The Department will make
every effort to provide competent personnel to ensure the health, safety, and
welfare of the citizens of Braselton through fair and equal application of the
State Minimum Standard Construction Codes.
Braselton Building Inspections Division
4982 Hwy 53, Braselton, Georgia 30517
Clay (Randy) Batey, Building
Official
Office and inspection requests:
706-654-3915
- Are there special instructions for obtaining a
permit? Yes, see the
Building Permit Requirements for New Residential Construction document.
- Can I obtain permit forms online? Yes. Please
follow this link to the permit forms you need.
- What codes are enforced in Braselton? The latest codes
as adopted and amended by the Georgia Department of Community Affairs. You may
view the list of codes and download the current Georgia amendments at
www.dca.state.ga.us.
- Is there a plan review fee for residential plans? No.
What about commercial plans? Yes.
- Is there a 24 hour notice required prior to an
inspection? No. The Department strives to provide same day service; however,
this is our goal and not policy. There may be times when same day service is
not possible.
- What do I need to do to comply with the new Georgia
State Energy Code? You may use any one of the methods listed in Chapter 6 of
the 2003 Georgia State Energy Code Amendments for Type A-1 residential
buildings. For all other types of buildings see the code requirements.
How to Obtain a Building Permit
Building Inspector Qualification Statement (.pdf format. If you do not
have a .pdf format reader
click here to
download free reader.)
Permits: (.pdf format. If you do not
have a .pdf format reader
click here to
download free reader.)
Building Permit
Building Permit Requirements for New Residential Construction
Electrical Permit
Erosion Control Compliance Certification
Fuel / Gas Permit
Plumbing Permit
Mechanical Permit
Subcontractor Affidavit
“Single-Step” Residential Energy Code Compliance - Climate Zone 7A -Greater
Atlanta Area
-
– Option 7A-1
-
– Option 7A-2
-
– Option 7A-3
|